WORK CARRIED OUT IN TARRAGONA

Use: Public works.

The high speed of execution of the TABIHAUS® system is key in the world of education, where in little more than two months we must be able to leave the work delivered.

Its ease of assembly, the absence of cranes or scaffolding, but mainly its high technical performance, make TABIHAUS® a magnificent system for buildings that require a minimum of time.

velocimetros

High execution speed

usuario

Ease of assembly

calidad

High technical performance

CONTACT US WITHOUT ANY COMMITMENT

Invalid Email
Invalid Number

Address

Andaragón, Las Norias Industrial Estate,
19-A, 50450
MUEL (Zaragoza - Spain)

Telephone

Follow us