URGENT CONSTRUCTION BY COVID

Work carried out: in Lanzarote, COVID Hospital

Annex building to the hospital in Lanzarote, as an urgent building due to the pandemic.

With a primary steel structure, light Steel Frame is installed, which houses mineral wool inside.

alarma

Urgent execution

edificio-del-hospital

Functional building

calidad

Building regulations

Diseño sin título (24)

TABIHAUS® ACTS AS A PRIMARY WALL

In this construction, TABIHAUS® functions as a primary wall, guaranteeing compliance with building regulations.

MAIN CHARACTERISTICS

Therefore, TABIHAUS® creates in its function as a primary wall, an External Thermal Insulation Composite System, and the ventilated façade a convective insulation. In other words, the two architectural solutions in terms of insulation in one and the same building.

The result is a clean, absolutely functional building, but above all, in a record building time of 3 months, due to the urgency of the pandemic.

CONTACT US WITHOUT ANY COMMITMENT

Invalid Email
Invalid Number

Address

Andaragón, Las Norias Industrial Estate,
19-A, 50450
MUEL (Zaragoza - Spain)

Telephone

Follow us